Kinsend's
New ECO SYSTEM Is a more lightweight and easy to install system. Fix the 406
cliplock on the rooftop metal plate and
tighten the bolts. Fix the ECO rail on the 406 cliplock with Hex screw. PV
module on the ECO Rail with mid clamps and end clamps.
Lightweight rails can be installed on metal roofs, The U-shaped structure is a combination of guide rails and clamp. low cost and quick installation. Riveted or screwed onto raised corrugations.
Every size of module array possible
Simple and fast installation
No Rails necessary
Low material / Low fiting costs
Details
Installation Site
Trapezoidal and corrugated sheet metal
Installation Base
Riveted or screwed onto raised corrugation
Max Wind Speed
< 60m/s
Snow Load
< 80cm
Standards
AS/NZS 1170 &JIS C 8955-2011
Material
Al6005-T5 & Stainless steel
Anti-corrosive
Anodized
Warranty / Duration
12 years/ More than 25 years
Ground mounting system is made of aluminum to mount on concrete foundation or ground screws,Quick installation with large-scale ground photovoltaic system power station construction progress.
The steel solar ground installation structure is designed for large-scale commercial use on the ground and can be used with grounding screws or concrete bases.
Fast Installation Solar Carport Racking,The N-shaped structure is more streamlined, reducing the cost of the entire carport system and reducing obstruction to vehicles.
High suitability carport mounting system with panels horizontally layout , and solar installations in both waterproof and non waterproof carport structure are optional.