Solar Ground Project 872KW , Japan was successfully completed, and the distance of photovoltaic support was
measured at the installation site. When the installation site was too hard, or
there was too much gravel, it was inconvenient to hammer the column directly
into the ground, the ground screw could be selected. Before installation,
geological soil testing should be done to determine the appropriate hammering
depth. The solar structural design of the support system shall be based on local
national standards and load design, taking into account applicable climate
hazards and sunshine conditions in other areas.
Hot Sale Solar Mounting Solutions recommend for you